Posted by caleb scoefield

I am working on a foundation job where I am laying out about 50 concrete steel reinforced caissons.....25 require setting anchorbolts. I have done this once before with bad results. On a previous job I gave the contractor plenty of offset points for control to set the anchor bolts, I was even there when they set the anchor bolts...I pulled string lines, and measured swing ties...everything was good.

To read the rest of this thread, go to www.rpls.com/forums/viewtopic/2/1276311