Posted by Benc

Does anyone here have any actual experience in transfering vertical columns as the building goes up? Can you give me an idea as to the accuracy required when you layout column positions floor to floor? I am using the "hole in the floor" technique looking down on the previous floors to a point on the ground. Problem is when I need to layout a point that is not physically visible from the main column point.

To read the rest of this thread, go to www.rpls.com/forums/viewtopic/45/1115897.