- Central Florida Commuter Rail Transit
- SR 44, US 301 and SR 464 CSX Grade Separation Design Build
- SR 46 Lake Jesup Design Build
- SR 15 from SR 15 (Colonial Drive) to South of SR 423 (Lee Road) Resurfacing
- SR 500/US 192 Indian River Relief Bridge Design Build
- SR 40 From SR 45 (US 41) to CR 225A (SW 8th Avenue) Resurfacing
- SR A1A Indian River County Line to just North of Oak Street Resurfacing
- SR 442 @ Airpark Blvd. (Traffic Signal Update)
- I-4 Orlando Utilities Commission Substation Reconfiguration at SR 408
Bringing Trisha on board reinforces Lochrane’s commitment to this specialized service that supports the firm’s seamless approach to providing top quality Subsurface Utility Exploration and Utility Engineering services to our clients. Lochrane’s Utility Design and Engineering process focuses on the importance of minimizing impacts to utilities from the proposed drainage design in an effort to minimize costly project expenses and potential claims during construction.