Architect-engineer or engineering services are required for preparation of DD Form 1391 Plus and Parametric Cost Estimate (PCE) documentation. Plans, specifications, cost estimates, related studies, all associated engineering services, shop drawing review, as-built drawing preparation and Quality Assurance Plan (QAP) preparation are all required. Operation and Maintenance Support Information (OMSI), construction inspection and engineering consultation services during construction are also required. The contract includes the preparation of cost data using the NAVFAC "SUCCESS" system in work breakdown structure (WBS), DD Forms 1391,Witness Data and site plan preparation formatted in preliminary engineering documentation. The work may also include surveying, soil borings, hazardous materials identification, and energy computations. The anticipated start date is December 2001 with a design completion date of March 2003.

Bayla Mack, program analyst. Phone: 757-322-8271. Fax: 757-322-8285. E-mail: MackBL@efdlant.navfac.navy.mil. Sharon Taylor: contract Specialist. Phone: 757-322-8258. Fax: 757-322-8280. E-mail: TaylorSA@efdlant.navfac.navy.mil