Point of Beginning

Horizontal Control for Bridge Abutment Layout

April 4, 2011

Posted by caleb scoefield

Does anyone know of any resources I can draw from in order to gain some knowledge on setting control for Brige layout. I am relatively new to bridge construction. I have spent the last 13 years of my surveying career doing large closed loop surveys for large farm tracts, and proposed houseing developments, bridge construction is a new animal for me. The job I am starting soon is a small one, consisting of only two bridge abutments, with a 40' span between them...

To read the rest of this thread, go to www.rpls.com/forums/viewtopic/2/1276142