Point of Beginning

PORT ENTRANCE REPLACEMENT, SOUTH CAROLINA

January 18, 2001
The work includes furnishing all labor, tools, equipment and materials to fabricate and install one 36 single steel pile marine foundation in approximately 20 feet of water at the entrance to Port Royal Sound near Hilton Head, South Carolina. The new structure must be precisely located to properly mark the centerline extension of Port Royal Sound Range; accurate surveying will be required.

jdavis@ceumiami.uscg.mil