Point of Beginning

FAMILY HOUSING IMPROVEMENT AND REPLACEMENT PROJECTS, MARYLAND

September 29, 2000
The possibility of petroleum containing soil may exist at the project sites. If these materials or other similar types of material are encountered, the A/E Contractor may be required to conduct hazardous material removal surveys, including testing and sampling, provide design removal procedures and prepare construction documents in accordance with applicable rules and regulations pertaining to such materials. Contracting Officer, Naval Facilities Engineering Command, Engineering Field Activity Chesapeake (Attn: Code 02AE), Washington Navy Yard, Building 212, 1314 Harwood St, SE, Washington, DC 20374-5018. E-mail contact: rjones@efaches.navfac.navy.mil