POBOnline
  Home
  Subscribe
  RPLS.com Community
  eNews Subscription
  eNews Archive
  Subscription Customer Service
  Online Updates
  Latest News
  Calendar of Events
  Call for Papers
  Webinars
  Fun + Games
  New Products
  Surveying in the Headlines
  Current Issue
  Cover Story
  Features
  Columns
  Resources
  Archives
  Classified Ads
  Classified Listings
  Digital Edition Archives
  Distance Education
  Geo Locator Buyers Guide
  Industry Links
  Information Showcase
  Market Research
  POB Store
  Product Showrooms
  Product Surveys
  POB Info
  Special Collections
  GIAA Mailbag/Tool Tips
  GPS Observer Series
  Site Prep
  Surveying GIS
  Surveyor + the Law
Search in: EditorialProductsCompanies
Back to Basics: Turning 50
by Wesley G. Crawford RPLS
April 29, 2009

ARTICLE TOOLS
EmailEmailPrintPrintReprintsReprintsshareShare

No, not my age … I passed that a few years ago. I’m referring to the number of articles I have written for POB over the years, including this one.


As I contemplated what to write about in my 50th article for POB, I went back and reviewed my previous articles to see what topics I had covered. I also wondered if there is still a need for a column titled “Back to Basics” considering the changes in technology that have occurred in the 13 years that I have been writing.

The articles I have written over the years have covered a diverse range of topics related to surveying and layout and also some topics that were somewhat philosophical. I have consciously made an effort with every article to select topics that I thought would be of interest to all readers but especially individuals who were just entering the field of surveying. I felt that those who were new to the profession may not be aware of some of the basics of surveying measurement, the fundamentals of instrument use or the standard layout techniques. Fortunately for me, there are always individuals in our profession who can benefit from a review of the basics.


A Quick Recap

My articles from the past can be separated into a number of distinct categories--including planning, communications, instrument setup and use, calibration, equipment care, mistakes and errors, layout techniques, quick checks, rules of thumb, standard practices--as well as some miscellaneous topics.

One of my favorites was titled “Mistakes and errors from the field” (November 2004) and was based on a questionnaire I sent out to construction layout surveyors as I was working on the 3rd edition of my book, “Construction Surveying and Layout.” Just a few of the common mistakes respondents had listed included writing the wrong elevation on a stake and using that elevation to locate a footing; laying out the mirror image of the structure because of lack of understanding of what the plans are communicating; transposing numbers when measuring distance by chaining; using a foot chain and converting to a metric measurement; not holding the prism rod plumb causing the distance to be wrong; not setting up an electronic instrument exactly over the point and not checking to see if the instrument was still level after using it for an extended period of time; not understanding the potential sources of error in total station measurement; failing to turn equal numbers of direct and reverse angles when turning angles; not leveling the instrument when the vertical angle was measured; not “closing the loop when leveling”; not calibrating the instrument before leveling; and being so concerned about the decimal part of the reading when leveling that we read the wrong foot mark.

In “Long backsight and short foresights” (November 2003), I outlined how having a long backsight and a short foresight is a fundamental principle that should always be followed. It is a principle that affects the size of errors in the sighting and angle measurement process of layout. By having a long backsight and a short foresight, the size of sighting errors can be reduced--which is a goal of any good construction layout surveyor. It sometimes isn’t convenient and may take more effort to provide a long backsight by requiring someone to walk long distances, but the rewards are great by ensuring that errors will be reduced.


In a two-part series on “One-person surveying techniques” (January 2001), I noted that “with the advent of robotic total stations and GPS, one-person surveying is much easier and is becoming a common practice.” However, even without those technologies, one-person surveying is still possible. I related working alone in surveying to working alone as a woodworker. An efficient woodworker figures out what is needed when building a “jig” to do a repetitive task. The jig then acts as a second person in the activity. An example might be to use a shovel with a “D” handle to hold up a level rod as readings are taken. Another might be to use a bungee cord around a tripod and hold a level rod vertically over a bench mark. The article highlighted a number of one-person techniques in layout that could be used when working alone or when working with a laborer or carpenter.

Another favorite of mine was my March 2008 article on “The one-minute, one-person peg test.” In this piece, I explained how a peg-test area could be set up using a yardstick, a piece of level rod or a section of carpenter’s tape positioned at exactly the same elevation on two stationary objects 200 to 300 feet apart with a clear line of sight between them. Using this peg-test area, one person can perform a calibration test in less than one minute.

Other topics that I have written about over the years include pacing, rules of thumb, quick setup with an optical plummet, leveling an instrument, instrument use, chaining, total stations, lasers in construction, planning, preparation, seminars and education, the role of field engineers, dressing for safety, tolerances, and calculating directions with azimuths.

Oldies but Goodies

Whew, I’m glad I did not have to write all of these articles at one time. It makes me tired to think about all of the effort involved.

I realize some procedures that I have written about are no longer used on a daily basis by many surveyors. I even had someone once say to me, “You’re the guy who writes about the old methods.” Yep, that’s me. Regardless, I do strongly believe that some surveyors and surveyors-in-training still need to hear about some of these old methods of layout and measurement because many of them are still relevant. When the power goes out on the total station or GPS system, knowing some of the “old techniques” may save the day.

I think I can conclude that “Back to Basics” will be applicable for a few more years as long as layout points are put in by people.


Wesley G. Crawford RPLS
Wesley G. Crawford is a professor of building construction management at Purdue University.
Wesley Crawford is the author of the highly acclaimed book Construction Surveying and Layout, now in its third edition. For information, visit www.creativeconstruction.com or www.pobonline.com (click on POB Store).


|PrintEmail
  Comments (0)Post a Comment
 

No HTML or BBCode in comments please.
 


Did you enjoy this article? Click here to subscribe to the magazine.














BNP Media
© 2010 BNP Media. All rights reserved. | Privacy Policy